HOME BUILDERS
From the design appointment
to the closing statement.
Asterion helps home builders keep each buyer’s selections, upgrades and change orders on one record, so what the buyer chose is what purchasing ordered, the trades built and the closing statement charges.
TRY IT · SELECTION TO CHANGE ORDER
Turn a buyer’s upgrade request into a signed change order.
Type what the buyer asked for at the design appointment or on a walkthrough. The demo lists each upgrade, holds it at price pending, records the buyer’s approval and only then marks it ready for the draw or the closing statement.
Runs entirely in this browser tab. Nothing you paste, drop or photograph is uploaded or sent. Each demo has three scenarios on the same engine: a clean case, a messy one and an edge case. Every company, person, place and number in them is fictional.
The demo did not load. Check your connection and try again.
YOUR HOURS · YOUR NUMBERS
What does the repeat work cost you in hours?
Enter your own numbers for the repeat work around the selection change-order demo; leave a line blank if it does not happen. Every line shows its arithmetic. It runs in this tab and sends nothing.
01Buyer selections re-typed into purchasing
02Late changes priced and written up by hand
03Draw requests built from the budget and changes
04Closing statements checked against upgrades
Fill in at least one line to see the total.
Hours are time, not cash saved. Whether any of it can be removed depends on your process; that is what the review checks.
BEFORE AND AFTER
The same request,
by hand and connected.
Most of the change is in the middle: the details are read once, and gaps are found before the work waits on them. The first and last steps usually stay with your team.
See what changes, step by step 4 of 5 steps change
| Step | By hand today | Connected |
|---|---|---|
| 1 | Buyer picks upgrades at the design appointment | Buyer picks upgrades at the design appointment |
| 2 | The selection sheet is re-typed into purchasing | The selection sheet becomes the record purchasing orders fromchanges |
| 3 | A change on a walkthrough is agreed out loud | A walkthrough change becomes a change order at price pendingchanges |
| 4 | Nobody checks whether material was already ordered | The cutoff, the order status and the work in place are checked before anyone says yeschanges |
| 5 | Upgrades are added up again for the draw and for closing | The draw and the closing figures read the same approved upgradeschanges |
CONTRACT TO CLOSING
Where does a buyer’s selection go missing?
A selection is made once and used five times. The table shows where each use happens and what commonly breaks between them.
| Stage | What happens | What goes missing |
|---|---|---|
| Contract | Base plan, lot and price are signed. | Options promised in a conversation, not on the contract. |
| Selections | The buyer picks finishes and upgrades at the design appointment. | A selection sheet that never reaches purchasing. |
| Cutoff | Each selection has a date after which it cannot change. | A late change accepted on site after the material was ordered. |
| Build and draws | Purchase orders go to trades and suppliers; the lender releases draws. | Upgrade costs that are paid but never charged. |
| Closing | Final price, credits and upgrades on the settlement statement. | An upgrade the buyer believes was included. |
THE SELECTION CUTOFF
Can this change still be made?
Most disputes start with a change requested after the cutoff. Before anyone says yes on site, three answers should be on the record.
If purchasing has placed the order, the change has a restocking or reorder cost before any labor.
Moving a framed wall or roughed-in outlet is a different price from changing a drawing.
A verbal yes on a walkthrough is not an approved change order. The buyer signs the price first.
CONFIGURE → CONNECT → BUILD
Is it already in your builder software?
Builders run construction and selections in builder management systems; production builders often add supply-chain tools such as Hyphen Solutions, next to an accounting package. These are examples to inspect, not partners. We first check whether selections, change orders and purchase orders are already connected in what you own, then connect what is not, and build only the remaining gap, such as a check that every approved upgrade appears on the closing figures.
ILLUSTRATIVE SCENARIO · FICTIONAL
Lot 12 and the office wall.
The fictional buyers of Lot 12 chose a quartz kitchen and extra lighting at their design appointment and initialed the sheet. Two weeks after framing, on a walkthrough, they asked for two garage outlets and to move an office wall two feet. The superintendent texted it in; the buyers said yes out loud.
With one selections record, the design-center upgrades are already priced and ordered. The walkthrough requests become a change order at price pending, the framing change is priced with the work in place, and nothing is built until the buyers sign. At closing, every approved upgrade is on the statement because it never left the record. This is a pattern to look for, not a client result.
What the review looks at
- One home, traced from contract to closing.
- Where selections are typed again for purchasing.
- How late changes are approved and priced today.
QUESTIONS
Answers before you book.
How do home builders keep selections and change orders straight?
Give every selection one record from the design appointment to the closing statement: what was chosen, its price, who approved it and when it had to be final. Builder management systems often handle this when set up; the gap is usually the hand-off to purchasing and to the closing figures. See extra work to invoice
What happens to a change after the selection cutoff?
It should go through a written change order with its price and the buyer’s approval before anyone orders material or changes the build, even when the request comes on a walkthrough.
Can this connect to the lender’s draw process?
Draw requests follow the lender’s own process and forms. What we can do is make sure the budget, the approved changes and the work in place agree before a draw is requested, so nobody re-adds the numbers by hand.
Do you work with custom builders as well as production builders?
Yes. The steps are the same; a custom builder has fewer homes and more changes per home, so the selections record matters even more.
LET’S LOOK AT THE REAL WORK
What is your team
working around?
Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.
Free, 30 minutes, no commitment.
Start with the problem, not the technology.