HOME BUILDERS

From the design appointment
to the closing statement.

Asterion helps home builders keep each buyer’s selections, upgrades and change orders on one record, so what the buyer chose is what purchasing ordered, the trades built and the closing statement charges.

TRY IT · SELECTION TO CHANGE ORDER

Turn a buyer’s upgrade request into a signed change order.

Type what the buyer asked for at the design appointment or on a walkthrough. The demo lists each upgrade, holds it at price pending, records the buyer’s approval and only then marks it ready for the draw or the closing statement.

Runs entirely in this browser tab. Nothing you paste, drop or photograph is uploaded or sent. Each demo has three scenarios on the same engine: a clean case, a messy one and an edge case. Every company, person, place and number in them is fictional.

YOUR HOURS · YOUR NUMBERS

What does the repeat work cost you in hours?

Enter your own numbers for the repeat work around the selection change-order demo; leave a line blank if it does not happen. Every line shows its arithmetic. It runs in this tab and sends nothing.

01Buyer selections re-typed into purchasing

? selections × ? min × 48 weeks ÷ 60 = ? hours a year

02Late changes priced and written up by hand

? change orders × ? min × 48 weeks ÷ 60 = ? hours a year

03Draw requests built from the budget and changes

? draws × ? min × 48 weeks ÷ 60 = ? hours a year

04Closing statements checked against upgrades

? closings × ? min × 48 weeks ÷ 60 = ? hours a year

Fill in at least one line to see the total.

Hours are time, not cash saved. Whether any of it can be removed depends on your process; that is what the review checks.

BEFORE AND AFTER

The same request,
by hand and connected.

Most of the change is in the middle: the details are read once, and gaps are found before the work waits on them. The first and last steps usually stay with your team.

See what changes, step by step 4 of 5 steps change
The same request, step by step. A common pattern to compare with yours, not a finding about your business.
StepBy hand todayConnected
1Buyer picks upgrades at the design appointmentBuyer picks upgrades at the design appointment
2The selection sheet is re-typed into purchasingThe selection sheet becomes the record purchasing orders fromchanges
3A change on a walkthrough is agreed out loudA walkthrough change becomes a change order at price pendingchanges
4Nobody checks whether material was already orderedThe cutoff, the order status and the work in place are checked before anyone says yeschanges
5Upgrades are added up again for the draw and for closingThe draw and the closing figures read the same approved upgradeschanges

CONTRACT TO CLOSING

Where does a buyer’s selection go missing?

A selection is made once and used five times. The table shows where each use happens and what commonly breaks between them.

StageWhat happensWhat goes missing
ContractBase plan, lot and price are signed.Options promised in a conversation, not on the contract.
SelectionsThe buyer picks finishes and upgrades at the design appointment.A selection sheet that never reaches purchasing.
CutoffEach selection has a date after which it cannot change.A late change accepted on site after the material was ordered.
Build and drawsPurchase orders go to trades and suppliers; the lender releases draws.Upgrade costs that are paid but never charged.
ClosingFinal price, credits and upgrades on the settlement statement.An upgrade the buyer believes was included.

THE SELECTION CUTOFF

Can this change still be made?

Most disputes start with a change requested after the cutoff. Before anyone says yes on site, three answers should be on the record.

01Is the material ordered?

If purchasing has placed the order, the change has a restocking or reorder cost before any labor.

02Is the work in place?

Moving a framed wall or roughed-in outlet is a different price from changing a drawing.

03Who approved the price?

A verbal yes on a walkthrough is not an approved change order. The buyer signs the price first.

CONFIGURE → CONNECT → BUILD

Is it already in your builder software?

Builders run construction and selections in builder management systems; production builders often add supply-chain tools such as Hyphen Solutions, next to an accounting package. These are examples to inspect, not partners. We first check whether selections, change orders and purchase orders are already connected in what you own, then connect what is not, and build only the remaining gap, such as a check that every approved upgrade appears on the closing figures.

ILLUSTRATIVE SCENARIO · FICTIONAL

Lot 12 and the office wall.

The fictional buyers of Lot 12 chose a quartz kitchen and extra lighting at their design appointment and initialed the sheet. Two weeks after framing, on a walkthrough, they asked for two garage outlets and to move an office wall two feet. The superintendent texted it in; the buyers said yes out loud.

With one selections record, the design-center upgrades are already priced and ordered. The walkthrough requests become a change order at price pending, the framing change is priced with the work in place, and nothing is built until the buyers sign. At closing, every approved upgrade is on the statement because it never left the record. This is a pattern to look for, not a client result.

What the review looks at

  • One home, traced from contract to closing.
  • Where selections are typed again for purchasing.
  • How late changes are approved and priced today.

Book a free 30-minute reviewBook a review

QUESTIONS

Answers before you book.

How do home builders keep selections and change orders straight?

Give every selection one record from the design appointment to the closing statement: what was chosen, its price, who approved it and when it had to be final. Builder management systems often handle this when set up; the gap is usually the hand-off to purchasing and to the closing figures. See extra work to invoice

What happens to a change after the selection cutoff?

It should go through a written change order with its price and the buyer’s approval before anyone orders material or changes the build, even when the request comes on a walkthrough.

Can this connect to the lender’s draw process?

Draw requests follow the lender’s own process and forms. What we can do is make sure the budget, the approved changes and the work in place agree before a draw is requested, so nobody re-adds the numbers by hand.

Do you work with custom builders as well as production builders?

Yes. The steps are the same; a custom builder has fewer homes and more changes per home, so the selections record matters even more.

LET’S LOOK AT THE REAL WORK

What is your team
working around?

Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.

Book a free 30-minute reviewBook a review

Free, 30 minutes, no commitment.
Start with the problem, not the technology.