QUOTING AND ESTIMATING GUIDE

Quoting and estimating
software for job shops

A job-shop quote prices material, setup and run time for each operation, outside processing, and the certs and inspection the customer requires, at each quantity. Software helps in three places: reading the request, pricing it consistently and turning the accepted quote into a job without re-typing. Use your ERP’s estimating if it holds your routings; buy quoting software when CAD analysis would save the most time.

ANATOMY OF AN ESTIMATE

Where each number in a quote should come from.

Every line has a right source. Software closes the gap between that source and where the number really comes from.

The lines of a job-shop estimate
LineWhere it should come fromWhere it often comes from
MaterialCurrent supplier price for the grade and size, plus cut allowance and saw kerfThe last quote’s price, or a phone call for every RFQ
Setup per operationActual setup history for that machine and part familyThe estimator’s memory
Run time per pieceCycle time from the program or a similar part, times quantityA guess adjusted by feel
Outside processingCurrent vendor quotes for anodize, plating or heat treat, including their lot minimumsAn old vendor quote in a folder
Inspection and paperworkThe customer’s requirements: first article, material certs, certificate of conformanceLeft out until the PO arrives
Quantity breaksSetup spread across each quantity, with material bought at each quantity’s priceA fixed discount table

Setup against run time is the line that makes or loses money on short runs. A two-hour setup is most of the cost on a quantity of 5 and a rounding error on a quantity of 500. A quote built on one blended hourly rate hides that.

ILLUSTRATIVE SCENARIO · A COMPOSITE, NOT A CLIENT

A 30-person job shop re-typing quotes into JobBOSS²

The estimators quote in an Excel template because it holds the shop’s rules: cut allowances, an outside-processing markup and a table of setup times by machine. The shop runs JobBOSS², which ECI describes as centralizing quoting, job costing, scheduling and inventory, but its quoting was never set up with those rules.

So every accepted quote is re-typed into JobBOSS² as a job: part number, revision, quantity, routing, price. Now and then something is keyed wrong, usually a revision letter or a quantity break, and it surfaces at the saw or on the invoice.

The first fix to try is configuration: load the setup table and markups into the ERP’s quoting so an accepted quote converts to a job in one step. If the Excel rules cannot be expressed there, a small connector can carry the finished spreadsheet quote into the ERP as a job. That is a connection, not a new quoting system. A quoting product is worth evaluating only if most RFQs arrive as CAD models and part analysis would save the estimators real time.

An illustration of common patterns in small manufacturers. It describes no real company, customer or result.

WHERE ESTIMATORS LOSE TIME

Six steps, and only one of them is estimating.

Time one week of real requests before choosing software. The slowest step is often not the estimate.

  1. Read and sort

    Separate quotable requests from those missing drawings, revisions, quantities, material or finish.

  2. Clarify

    Ask the customer what is missing. Track how many requests need a question before anyone can price them.

  3. Estimate

    Price material, operations, outside processing and paperwork at each quantity.

  4. Enter and send

    Type the quote into the system that sends it. This is where re-keying starts.

  5. Follow up

    Give each sent quote an owner and a next step, so it does not simply age out.

  6. Convert to a job

    Turn the won quote into a job with the same revision, routing and price, ideally without typing.

BUY, CONFIGURE, CONNECT OR BUILD

Four options, and when each one fits.

CONFIGURE

Your ERP’s estimating or quoting module

Fits when your routings and work centers already live in the ERP and quotes must become jobs without re-typing. JobBOSS² and E2 MFG both list estimating or quoting; Fulcrum lists quoting and sales orders. Configure it with your real setup and run times before judging it.

BUY

Dedicated quoting software

Fits when most requests arrive as CAD models for processes the product supports. Paperless Parts describes “automated part file analysis” for CNC, sheet metal, Swiss and additive work, and lists ERP integrations including ECI E2 Shop, Epicor, Fulcrum, Infor Visual and MIE Solutions. Confirm your ERP and edition are supported.

CONNECT

Carry the quote you already build into the ERP

Fits when estimators trust their spreadsheet or quoting tool and the only waste is re-entering the result. The connection writes the accepted quote into the ERP as a job.

BUILD

A small intake or follow-up step

Fits when the slow part is sorting RFQs from a shared inbox, chasing missing information or following up, and no product covers how your customers send work. It should write into the ERP or quoting tool, not replace it.

For a fuller comparison of buying quoting software against a custom workflow, read Quoting software or a custom quoting workflow?

THE QUIET FAILURE

Revisions are where quotes go wrong.

Quote the revision shown on the drawing, print it on the quote and carry it to the job. When a customer sends a new revision after you have quoted, re-check the quote; do not just change the date. A system that stores the drawing file with the quote line makes that check possible. An email thread does not.

Quantity works the same way: if the PO quantity matches none of your quoted breaks, its price is not one you agreed to.

THE HONEST PART

When you don’t need custom work.

  • One estimator handles a manageable number of quotes and the inbox is not the bottleneck.
  • Your ERP’s quoting can hold your rules but was never set up. Set it up.
  • The real problem is missing information from customers. A better RFQ checklist or request form may fix most of it.

QUESTIONS

Quoting questions, answered plainly.

Short answers. Your own systems and customers decide the details.

Can AI quote our parts?

AI can read the text of a request and the notes on a drawing, pull out quantities, materials and due dates, and pre-fill a draft. Pricing still needs your estimator’s judgment and your rates. Tolerances and symbols on drawings are where current AI tools are least reliable. More on AI and engineering drawings.

Should estimators quote in the ERP or a spreadsheet?

In the ERP if it can hold your rules, because the quote then becomes the job with nothing re-typed. A spreadsheet is fine while the ERP cannot, provided the accepted quote reaches the ERP without being keyed in again.

What about quotes involving controlled defense data?

Use tools built and assessed for that data, and check every vendor against your own compliance requirements. Asterion does not take on workflows that touch controlled data such as CUI or ITAR material.

THE BUSINESS SYSTEMS REVIEW

Bring one week of RFQs.
Leave with the step to fix first.

In a free 30-minute review we look at how requests arrive and move, and tell you whether your ERP, quoting software, a small connection or no change fits best.

Book a free 30-minute reviewBook a review

What you leave with

  • Which seam to fix first, and why.
  • What the systems you already pay for can do once configured.
  • Whether anything is worth building. “Nothing” is an acceptable answer.

Free, 30 minutes, no commitment. Bring a redacted example, not drawings, customer records or controlled data.

SOURCES

Vendor descriptions quote or summarize each vendor’s own public page, accessed November 2026. They are examples, not rankings or recommendations. Asterion is not a partner or reseller of any vendor named here. Check current features and editions with the vendor.

LET’S LOOK AT THE REAL WORK

What is your team
working around?

Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.

Book a free 30-minute reviewBook a review

Free, 30 minutes, no commitment.
Start with the problem, not the technology.