ERP GUIDE · JOB SHOPS
ERP for small manufacturers
and job shops
A job-shop ERP is where a quote becomes a job with a routing, the job collects its real labor and material cost, and the shipment becomes an invoice. If that chain is split across QuickBooks, Excel and paper travelers, and nobody can say whether last month’s jobs made money, you have outgrown it. If a decent ERP is already installed, configure it before replacing it.
IN SHOP TERMS
What the ERP is supposed to hold.
An ERP is a handful of linked records. Whichever one lives somewhere else is where your re-typing happens.
- Part master and revisions
- Every part number with its current drawing revision. When the customer sends Rev D, the Rev C routing and price should stop being usable for new jobs.
- Routings
- The operations in order: saw, mill, deburr, outside anodize, inspect. Each has a work center, a setup time and a run time per piece.
- Bills of material
- The raw material and purchased parts for each part, and for assemblies, the parts beneath it.
- Jobs and travelers
- A job is one order for one part at one quantity. The traveler is that job’s routing, printed or on a screen at the machine.
- Job costing
- Estimated against actual hours and material for each job, so you can see which work makes money.
- Purchasing and receiving
- POs for material and outside processing, tied to the jobs that need them.
- Shipping and invoicing
- Packing lists, partial shipments, the certs that travel with the parts, and the invoice that follows.
SPREADSHEETS OR ERP
Have you outgrown QuickBooks and Excel?
SIGNS YOU HAVE
The spreadsheet is running the shop
- “Where is this job?” is answered by walking to the floor.
- Nobody can say whether a repeat job made money last time without digging through travelers.
- A revision change reached the quote but not the traveler, and a lot was cut to the old print.
- Partial shipments are tracked from memory or with a highlighter on the PO.
- Each quote, job, PO and invoice is typed fresh from the one before it.
SIGNS YOU HAVE NOT, YET
The owner can still see everything
- A few people and a few active jobs, all visible to the owner every day.
- A small catalog of repeat parts that QuickBooks inventory items keep up with.
- Winning work is the bottleneck, not tracking it.
If the second column describes you, a cleaner spreadsheet and disciplined QuickBooks items will beat an ERP project for now.
TWO SHAPES OF WORK
Job-shop ERP and repetitive-production ERP are different tools.
Job-shop systems assume any order may be a new part, quoted and routed from scratch, with cost collected per job. Repetitive systems assume the same items are planned against forecasts and stock. If you do both, make each vendor demonstrate your own mix of work.
| Product | How the vendor describes it | Worth asking in a demo |
|---|---|---|
| JobBOSS² (ECI) | “Quote-to-cash ERP designed for high-mix, low-volume job shops” that centralizes quoting, job costing, shop-floor scheduling and inventory; lists QuickBooks Desktop and Online integration. | Which modules, such as MES or CRM, are add-ons, and what the QuickBooks sync covers in each direction. |
| E2 MFG (ECI) | “An ERP for manufacturers that perform repetitive production work,” including estimating, job costing, purchasing, quality control, scheduling and shipping. | How one-off quoted jobs run alongside repeat work. |
| Global Shop Solutions | “35+ applications from quote to cash,” including scheduling, shop floor data collection, quality, inventory, shipping and purchasing, offered as cloud, government or on-premise. | Which applications you need first, and which can wait. |
| ProShop | Calls itself a “system of execution” rather than a “system of record,” with ERP, QMS and MES, for shops “where documentation is as critical as the part.” | How much of your current paperwork it replaces rather than duplicates. |
| Fulcrum | “Cloud manufacturing software” built for precision CNC shops and sheet metal fabricators, covering quoting, scheduling, inventory and job tracking. | How it connects to the accounting system you keep. |
| MRPeasy | “MRP software for small manufacturers,” described as ideal for companies with 10 to 200 employees. | Whether its production orders fit a quoted, one-off job flow. |
ILLUSTRATIVE SCENARIO · A COMPOSITE, NOT A CLIENT
A 25-person machine shop on QuickBooks and a job spreadsheet
The office quotes in Excel, prints a Word traveler for each job and keeps a job-board spreadsheet the owner updates every morning. Operators write their hours on the traveler. At month end the bookkeeper invoices from packing lists in QuickBooks, and the travelers are filed by ship date.
A customer asks why a repeat bracket went up in price. Nobody can show last run’s actual hours without pulling travelers by date.
The sensible path is not custom software. It is a job-shop ERP that leaves accounting in QuickBooks, a migration of active parts, routings and open jobs (not ten years of history), and travelers printed from the ERP so hours land on the job. Custom work is justified only for a gap the ERP cannot fill, such as pulling RFQs from a shared Outlook inbox into its quote screen.
An illustration of common patterns in small manufacturers. It describes no real company, customer or result.
BUY, CONFIGURE, CONNECT OR BUILD
Four questions, in order.
Stop at the first question that gives you a clear answer.
List the modules you pay for and which ones people actually use. An unused scheduling or quality module calls for configuration, not a purchase.
If the ERP holds the right data but people carry it by hand to Outlook, a portal or QuickBooks, connect. If the data exists nowhere, configure or buy.
Most job-shop processes are. Bending a normal process to a good product’s defaults costs less than bending the product.
A custom piece earns its keep only where it is specific to your customers or your quoting, and it should write back to the ERP, not become a second record.
THE HONEST PART
When you don’t need custom work.
- You are choosing your first ERP. Pick the product, implement it properly and run it for a while before customizing anything.
- The vendor or its implementation partner can configure the gap. Ask them first; that is their job.
- The problem is a habit, such as hours never written on the traveler. Software will not fix a step nobody does.
- The connection you need already exists in the product, such as the QuickBooks sync ECI lists for JobBOSS². Turn it on and test it before paying anyone to build one.
Before connecting anything, run the ERP integration readiness checklist
QUESTIONS
ERP questions, answered plainly.
Short answers. Your own systems and customers decide the details.
Should we replace our ERP?
Usually not first. Replacing an ERP means re-entering parts, routings, open jobs and customer pricing, and retraining everyone. Check first whether the frustration comes down to two or three missing connections or modules that were never set up.
Can we keep QuickBooks?
Often, yes. Several small-manufacturer ERPs leave the general ledger in QuickBooks and sync invoices and bills to it. Confirm which records sync, in which direction, and what happens when someone edits one side.
THE BUSINESS SYSTEMS REVIEW
Bring your ERP login list.
Leave knowing what you already own.
In a free 30-minute review we look at the modules you pay for, the records kept outside them, and which gap is worth closing first.
What you leave with
- Which seam to fix first, and why.
- What the systems you already pay for can do once configured.
- Whether anything is worth building. “Nothing” is an acceptable answer.
Free, 30 minutes, no commitment. Bring a redacted example, not drawings, customer records or controlled data.
SOURCES
Vendor descriptions quote or summarize each vendor’s own public page, accessed November 2026. They are examples, not rankings or recommendations. Asterion is not a partner or reseller of any vendor named here. Check current features and editions with the vendor.
LET’S LOOK AT THE REAL WORK
What is your team
working around?
Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.
Free, 30 minutes, no commitment.
Start with the problem, not the technology.