Asterion helps contractors on Procore trace one change from the owner’s email to the billed amount, then connect only the steps that are still typed twice, with a project manager approving every number.
THE SHORT ANSWER
Check two Procore settings before connecting anything.
The first is your change-order tier setting. It decides how many steps a change passes through before it raises the contract value, and Procore will not let you change it once a change order exists on that tool.
The second is whether your accounting system is on Procore’s ERP Integrations list. If it is, the approved amounts may already reach accounting without custom work, and the remaining gap is the email and spreadsheet work before a change is entered.
THE SETTING THAT SHAPES EVERYTHING
How many steps a change takes in Procore.
From Procore’s Project Financials documentation. An integration has to carry each step your setting creates.
| Setting | Steps | Default for |
|---|---|---|
| 1-tier | A change order directly | Commitments |
| 2-tier | Potential change orders, grouped into a change order for approval | Prime contracts |
| 3-tier | Potential change orders, grouped into change order requests, then into a change order | Neither; Procore calls it uncommon |
ILLUSTRATIVE SCENARIO · NOT A CLIENT
One field change, from an owner’s email to the pay application.
An owner’s representative emails the superintendent: add two outlets and move a door in the break room. The photo is on the superintendent’s phone. The project runs 2-tier prime contract changes.
This is a made-up example to show the mechanics. It is not a client, a result or a measured time.
The email becomes a change event
The connection reads the project mailbox through Microsoft Graph and drafts a change event with the email, the photo and the project. Nothing is priced yet.
The estimator prices it once
Pricing happens in the Excel worksheet the team already trusts. The worksheet’s totals become the change event lines; nobody re-types them into Procore.
A potential change order goes out
The project manager reviews and creates the potential change order from the change event, then groups it into the change order the owner approves.
Approval is recorded where it happened
If the owner approves by email, that email is attached to the change order, not left in an inbox.
The approved amount reaches billing
Procore’s ERP integration, or a checked export, carries the approved amount and cost code to accounting and the next pay application.
THE ACCOUNTING SIDE
Accounting systems on Procore’s ERP Integrations list.
As listed in Procore’s ERP Integrations guide when we checked. What syncs differs by system, so read the connector’s own page.
| Group | Systems listed |
|---|---|
| QuickBooks and Xero | QuickBooks Desktop, QuickBooks Online, Xero |
| Sage | Sage 100 Contractor, Sage 300 CRE, Sage Intacct |
| Viewpoint | Viewpoint Spectrum, Viewpoint Vista |
| Others | NetSuite, Acumatica Cloud ERP, CMiC, Workday, Yardi Voyager, MRI Platform X, MYOB Advanced Construction |
WHAT BREAKS AND THE GUARD
Where Procore, email and Excel drift apart.
Common patterns, not a finding about your projects.
Tier chosen too late
Change orders exist before the team agrees how changes should flow, and the setting is locked. Guard: set it on every new project before the first change.
Scope differs between email and change order
The owner asked for one thing; the change order describes another. Guard: the original email stays attached and the project manager confirms scope.
Pricing in an unlinked worksheet
The worksheet is revised after the change is entered. Guard: the worksheet version used for pricing is linked from the change event.
Cost codes mapped differently
Procore and accounting use different code lists. Guard: map them once, write the mapping down and check it on each new project.
Verbal approval
The owner said yes on site and nothing was recorded. Guard: no change moves to billing without a recorded approval.
NATIVE → API → SCHEDULED EXPORT → A PERSON
Pick the lightest route for your accounting system.
Each step names the test that moves you to the next. Product names describe systems a business may already run. They are not partner, certification, endorsement or access claims, and the vendor decides what its own plan and permissions allow.
The tier setting, change events and the listed connector for your accounting system. Test: an approved change reaches accounting with the right cost code.
For turning project email into a draft change event. Test: a draft created in a test project carries the email and photo and changes nothing until approved.
If your accounting system is not listed. Test: the export carries cost code and amount, and someone owns the import.
Few changes a month. Test: one named person keeps up and nothing is billed without approval.
WHAT STAYS IN YOUR ACCOUNTS
Your Procore company, your tenant, your runbook.
A custom connection is an app in your Procore company account using OAuth 2.0, plus an app registration in your Microsoft 365 tenant, and either can be revoked. Photos and owner emails stay attached to the change in Procore or SharePoint.
The runbook names the tier setting each project uses, the cost-code mapping, where to see that a draft was created and what the team does if the connection stops.
QUESTIONS
Answers before you book.
Can we change our change-order tier setting later?
Not on a tool that already has change orders. Procore says to configure the tier before your team creates any, so decide it for each new project.
Does Procore connect to our accounting system?
Procore’s ERP Integrations tool lists QuickBooks, Sage, Viewpoint, NetSuite, Acumatica, CMiC, Xero and others. What syncs differs by system, so we read the connector page for yours before building anything.
Can AI write our change orders?
It can draft a change event from an email and a photo. Pricing, scope and approval stay with the project manager and the owner.
What should we bring to a review?
One recent change traced from the first email or field report to the billed amount: who priced it, where it was typed and how long approval took. A description is enough; leave out contracts.
LET’S LOOK AT THE REAL WORK
What is your team
working around?
Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.
Free, 30 minutes, no commitment.
Start with the problem, not the technology.