CONCRETE · MASONRY · PAVING
Every yard and ton,
from the plant to the pay app.
Asterion helps concrete, masonry and paving contractors match plant tickets, field tickets and daily reports to the bid item before the pay application goes out, and turn extra work at the pour into a priced, approved change.
TRY IT · FIELD TICKET TO CHANGE ORDER
Turn added yards, tons and patching into a priced change.
Type what the crew wrote down at the pour or the paving job, or photograph the field ticket. Quantities in cubic yards, tons and square yards become lines that stay at price pending until priced and approved.
Runs entirely in this browser tab. Nothing you paste, drop or photograph is uploaded or sent. Each demo has three scenarios on the same engine: a clean case, a messy one and an edge case. Every company, person, place and number in them is fictional.
The demo did not load. Check your connection and try again.
YOUR HOURS · YOUR NUMBERS
What does the repeat work cost you in hours?
Enter your own numbers for the repeat work around the field ticket demo; leave a line blank if it does not happen. Every line shows its arithmetic. It runs in this tab and sends nothing.
01Takeoffs and bid quantities re-keyed into the job budget
02Plant and field tickets typed into the job or billing system
03Daily reports, crew hours and equipment hours entered by hand
04Ticket quantities checked against the bid before the pay application
Fill in at least one line to see the total.
Hours are time, not cash saved. Whether any of it can be removed depends on your process; that is what the review checks.
BEFORE AND AFTER
The same request,
by hand and connected.
Most of the change is in the middle: the details are read once, and gaps are found before the work waits on them. The first and last steps usually stay with your team.
See what changes, step by step 4 of 5 steps change
| Step | By hand today | Connected |
|---|---|---|
| 1 | Bid quantities live in the estimate | Bid quantities live in the estimate |
| 2 | Plant tickets and field tickets arrive on paper over several days | Tickets are photographed or imported as they arrivechanges |
| 3 | Someone adds up tons and yards in a spreadsheet | Ticket quantities are matched to each bid itemchanges |
| 4 | Overruns are discovered while drawing up the pay application | Quantities over the bid are flagged for a change order or an explanationchanges |
| 5 | Weather standby is reconstructed from memory | Standby hours, the reason and who directed them are recorded on the daychanges |
THE TICKET TRAIL
Five papers, one quantity.
On a pour or a paving day the same quantity is written down several times by different people. Billing is right only when all five agree, or when someone has explained why they do not.
How many yards or tons left the plant, for which job.
What the crew placed or hauled, often with the superintendent’s signature.
Crew hours, equipment hours, weather and delays.
The quantity and unit price the job was won on.
What is billed this period against each bid item.
OVER THE BID
When the tickets say more than the bid.
Placed quantities often run over the bid: a thickened edge, soft subgrade, a deeper patch. The overrun is either a change order or a loss, and which one depends on whether it was written down and approved when it happened.
Billable
- Directed by the owner or the general contractor, in writing.
- Counted on a signed field ticket the same day.
- Priced and approved before the next pay application.
Usually lost
- A nod on site with no name on it.
- Tons on the plant ticket that never reach a field ticket.
- Extra work found weeks later while reconciling.
WEATHER DAYS
What should be recorded when rain stops a pour?
Who called the delay, when, which crew and equipment stood by and for how long, and what was rescheduled with the plant. Whether any of it is billable is a contract question; having it written down on the day is what lets you ask it. The demo’s edge case shows a weather hold that is not priced or sent until there is something to count.
CONFIGURE → CONNECT → BUILD
Is it already in your estimating or field system?
Heavy and civil contractors often estimate and track field time in systems such as HCSS HeavyBid and HeavyJob or Trimble B2W, while ready-mix and asphalt producers issue tickets from ticketing systems such as Command Alkon. These are examples to inspect, not partners. We check what your systems already capture, connect plant and field quantities to the bid items, and build only the remaining step, such as a weekly ticket-against-bid check.
QUESTIONS
Answers before you book.
How do concrete and paving contractors reconcile tickets with billing?
Match plant tickets, field tickets and daily reports to the bid item before the pay application, not after the owner questions it. Estimating and field systems hold much of this; the gap is usually the paper tickets that arrive late. See document intake
Is standby time for weather billable?
That depends on your contract, not on software. What software can do is make sure the standby hours, the reason and who directed the delay are written down on the day, so the question can be answered later.
Can AI read a scanned ticket?
It can read a printed plant ticket well and a handwritten field ticket less reliably. Every quantity read from a photo is checked by a person before it reaches billing.
Do you work with masonry contractors too?
Yes. Masonry is counted in units and square feet rather than yards and tons, but the trail is the same: the material delivered, the work in place, the bid item and the bill.
LET’S LOOK AT THE REAL WORK
What is your team
working around?
Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.
Free, 30 minutes, no commitment.
Start with the problem, not the technology.