ELECTRICAL CONTRACTORS
Every ticket the crew writes
should reach the invoice.
Asterion helps commercial electrical contractors follow extra work from the foreman’s time-and-material ticket to the change order, the pay application and the service invoice, around the estimating, field and accounting systems they already run.
TRY IT · T&M TICKET TO CHANGE ORDER
Turn a T&M ticket or service call into a priced change.
Type what the foreman wrote on the ticket, or photograph it. The demo splits the extra work into lines, keeps it at price pending until someone prices it, records the customer’s approval and only then marks it ready to bill.
Runs entirely in this browser tab. Nothing you paste, drop or photograph is uploaded or sent. Each demo has three scenarios on the same engine: a clean case, a messy one and an edge case. Every company, person, place and number in them is fictional.
The demo did not load. Check your connection and try again.
YOUR HOURS · YOUR NUMBERS
What does the repeat work cost you in hours?
Enter your own numbers for the repeat work around the T&M ticket demo; leave a line blank if it does not happen. Every line shows its arithmetic. It runs in this tab and sends nothing.
01T&M tickets typed from paper or photos into the job or billing system
02Change orders priced by hand from tickets and the estimate
03Service calls that grew, re-entered as extra work for invoicing
04Pay application lines checked against approved changes
Fill in at least one line to see the total.
Hours are time, not cash saved. Whether any of it can be removed depends on your process; that is what the review checks.
BEFORE AND AFTER
The same request,
by hand and connected.
Most of the change is in the middle: the details are read once, and gaps are found before the work waits on them. The first and last steps usually stay with your team.
See what changes, step by step 5 of 5 steps change
| Step | By hand today | Connected |
|---|---|---|
| 1 | Foreman writes extra work on a paper T&M ticket | Foreman writes extra work on a T&M ticketchanges |
| 2 | The ticket rides in the truck until someone collects it | The ticket is photographed and lands in one place the same daychanges |
| 3 | Project manager re-types it and prices it against the estimate | The ticket is read into lines once; the project manager sets every pricechanges |
| 4 | A phone approval is assumed to be enough | Unsigned or verbal approvals are flagged before the work is billedchanges |
| 5 | Approved work is found again at pay-app time | Approved changes are ready when the pay application is drawn upchanges |
WHERE HOURS LEAK
Where does an electrical job lose billable hours?
Labor hours are counted in the estimate, typed again into the job budget, written on tickets in the field and then has to be found again at billing. Each step below is a place it can drop.
Takeoff and labor units in the estimating program. At risk: The labor hours the job was bid on.
Budget and cost codes keyed into accounting or the ERP. At risk: The same budget, typed a second time.
T&M tickets, extra work and service calls on paper or a phone. At risk: Hours and material nobody priced yet.
Change orders, pay applications and service invoices. At risk: Work that was done but never billed.
SERVICE AND PROJECT WORK
One shop, two kinds of paperwork.
Many electrical contractors run a service department next to project work. The two need different things, which is why they often end up in different tools.
Service calls
- Dispatch, a price book and an invoice the same day.
- The call often grows: one dead outlet becomes a breaker and a damaged run.
- The risk: the extra work is done on a phone approval and never written down.
Project work
- A budget by cost code, change orders and monthly pay applications.
- Extra work arrives as a request from the superintendent on site.
- The risk: a signed ticket sits in a truck until the change-order deadline has passed.
CONFIGURE → CONNECT → BUILD
What should you check before buying anything?
Electrical contractors commonly estimate in programs such as Trimble Accubid, McCormick or ConEst; run service in field-service systems such as ServiceTitan or BuildOps; and keep job cost in construction accounting such as Foundation. These are examples to inspect, not partners. Before anything new, we check three things in what you already own:
Does the field or service system already capture T&M tickets with a photo and a signature? Turn it on before building anything.
Do approved tickets and labor hours reach job cost and payroll without a second entry? A supported export or connector usually closes this.
Only what is left: a weekly signed-ticket check against billing, or a small intake for paper tickets, with a person approving every price.
ILLUSTRATIVE SCENARIO · FICTIONAL
A Thursday with three T&M tickets.
A fictional 40-person electrical contractor has three foremen on three jobs. On Thursday each writes a T&M ticket: added circuits for a tenant’s copiers, a breaker replaced on a service call, and conduit rerouted around new ductwork. One ticket is signed, one was approved on the phone and one has no quantities yet.
With one home for tickets and a weekly check, the signed ticket is priced and billed on the next pay application, the phone approval is turned into a written one before Friday, and the unquantified one is held until the foreman can count it. Nothing here is a client result; it is the pattern we look for.
What the review looks at
- One recent ticket, traced from the truck to the invoice.
- Where labor hours are typed more than once.
- Whether signed tickets are ever compared with what was billed.
QUESTIONS
Answers before you book.
How do electrical contractors stop losing T&M tickets?
Give the ticket one home from the moment the foreman writes it to the moment it is billed. Most field-service and project systems can hold a ticket with photos and a signature; the gap is usually that nobody checks the signed tickets against billing each week. Start with that weekly check, then connect what is left. See extra work to invoice
Should service work and project work live in the same system?
Often not, and that is fine. Service calls need dispatch, a price book and a quick invoice; project work needs budgets, change orders and pay applications. What matters is that labor hours and material reach payroll and job cost the same way from both.
Can AI price a change order?
No. AI can read a photographed ticket into lines and flag a missing quantity or signature. Your estimator or project manager sets every price, and the customer approves it.
Which estimating and field tools do you work with?
We start from what you run. Product names on this page are examples to inspect, not partner or access claims; your edition and settings decide what is possible.
LET’S LOOK AT THE REAL WORK
What is your team
working around?
Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.
Free, 30 minutes, no commitment.
Start with the problem, not the technology.