MACHINE SHOPS · CNC · FABRICATION

Quote it once.
Release the job from the quote.

Asterion helps machine shops and fabricators trace a request for quote from the inbox to the job, then remove the re-typing and missing-detail chases around the job-shop system they already run. Your estimator keeps the pricing decision.

Check your ERP first: E2 MFG, for example, already includes estimating, job costing, purchasing, scheduling and shipping (ECI Solutions, E2 MFG).

TRY IT · REQUEST FOR QUOTE

Paste an RFQ email. Get the quote-intake sheet.

Paste a real request for quote, drop the email, PDF or a photo of it, or pick a fictional scenario. The demo pulls out part, material, quantity, tolerance, finish and due date, shows where each came from, and writes the clarification email for whatever is missing.

Runs entirely in this browser tab. Nothing you paste, drop or photograph is uploaded or sent. Each demo has three scenarios on the same engine: a clean case, a messy one and an edge case. Every company, person, place and number in them is fictional.

YOUR HOURS · YOUR NUMBERS

What does the repeat work cost you in hours?

Enter your own numbers for the repeat work around the RFQ demo; leave a line blank if it does not happen. Every line shows its arithmetic. It runs in this tab and sends nothing.

01RFQs read and typed into the quote sheet or ERP

? RFQs × ? min × 48 weeks ÷ 60 = ? hours a year

02Emails chasing a missing material, revision or quantity

? emails × ? min × 48 weeks ÷ 60 = ? hours a year

03Won quotes re-entered as a sales order and job

? orders × ? min × 48 weeks ÷ 60 = ? hours a year

04Calls and emails asking where an order is

? questions × ? min × 48 weeks ÷ 60 = ? hours a year

Fill in at least one line to see the total.

Hours are time, not cash saved. Whether any of it can be removed depends on your process; that is what the review checks.

BEFORE AND AFTER

The same request,
by hand and connected.

Most of the change is in the middle: the details are read once, and gaps are found before the work waits on them. The first and last steps usually stay with your team.

See what changes, step by step 4 of 6 steps change
The same request, step by step. A common pattern to compare with yours, not a finding about your business.
StepBy hand todayConnected
1RFQ arrives as an email with a PDF drawingRFQ arrives as an email with a PDF drawing
2Someone reads it and types part, material, quantity and due date into the quote sheetThe details are read once and filled into the quote sheet, each with the line it came fromchanges
3Missing revision found while estimating; an email goes out and the quote waitsMissing revision is flagged before estimating, with the clarification email draftedchanges
4Estimator prices itEstimator prices it
5Quote won; the same details are typed again into the ERP as an order and a jobQuote won; the order and job are created from the same recordchanges
6Customer calls to ask about status; someone checks the floorStatus can go out from the job record when it moves, so fewer calls need a trip to the floorchanges

WHO THIS IS FOR

For an owner, estimator or operations manager who quotes from email and spreadsheets.

When a request for quote arrives by email with drawings, gets priced in a worksheet and is typed again into the job-shop system, this page shows where that time goes and how to check it. Other manufacturers are welcome too. See the manufacturing overview

THREE HANDOFFS TO TRACE

Where does a quote get typed again?

These are workflow patterns to examine, not a finding that every shop has a software problem.

01 / RFQ INTAKE

Request for quote and drawings to a quotable record

Starts when: a customer emails drawings, uploads a request for quote (RFQ) on the website or sends one through a portal.

Information needed: part number, drawing revision, material, finish, quantity breaks, tolerances that drive cost, due date and the customer contact.

People and approval: an estimator checks the request; anything ambiguous goes back to the customer as a clarification, not a guess.

Output: one request with its files and missing items visible, ready for the estimator instead of buried in an inbox.

WHEN EVIDENCE IS MISSING
  • the drawing and the email name different revisions
  • material or quantity is missing
  • the same part arrives twice under different names
  • a controlled-data drawing that must not leave its system

02 / QUOTE TO JOB

Approved quote to job and traveler

Starts when: the customer accepts a quote and sends a purchase order.

Information needed: the approved quote, purchase-order number, quantity, revision, routing and promised date.

People and approval: order entry checks the purchase order against the quote; the scheduler or operations manager releases the job.

Output: a job or work order in the existing system created from the quote, with its traveler, without re-typing the numbers.

WHEN EVIDENCE IS MISSING
  • the purchase order does not match the quote
  • the revision changed after quoting
  • a quantity break moves the price
  • capacity or material conflicts with the promised date

03 / CERTS AND STATUS

Certificates, approvals and customer status

Starts when: a job needs a material certificate, first-article or inspection record, or a customer asks where an order is.

Information needed: job number, required documents, current operation, promised date and who last updated the status.

People and approval: quality owns the documents; a customer-facing person decides what is shared and when.

Output: documents attached to the job and one current status, instead of files and answers scattered across email.

WHEN EVIDENCE IS MISSING
  • a certificate is missing at shipping
  • status on the floor and in the system disagree
  • a promised date slips without an owner
  • a customer asks before anyone has updated it

CONFIGURE → CONNECT → BUILD

Does your job-shop system already convert quotes to jobs?

Job-shop ERPs, quoting tools and accounting packages often include quote-to-job, document and status features that are licensed but not set up. We check the installed edition first. Product names are examples to inspect, not partner badges or access claims.

01Configure

Set up the quote, job, routing, document and status features you already own.

02Connect

Use a supported connector or interface between quoting, the job system and accounting once the account owner and readback are named.

03Build

Create the smallest request-intake step, validator or status view for the gap that remains, with a manual fallback.

KEEP, FIX OR REPLACE

Should we replace our job-shop ERP, or fix around it?

Usually fix around it first. When the complaint is slow quoting, re-typed orders or a schedule nobody trusts, the gap is often in the handoffs around the ERP, not the ERP itself. A replacement moves those same handoffs into a new system and adds a data migration. A replacement deserves a serious evaluation when the system cannot hold your routings or costing, is losing vendor support, or every workaround fights its data model.

Fixing around it usually works when

  • The ERP holds jobs, routings and costing correctly once data gets in.
  • The pain is typing quotes, orders or status from email and spreadsheets.
  • Features you already pay for, such as quote-to-job or document attachment, were never set up.
  • People trust the numbers in it but not how they got there.

A replacement deserves a real evaluation when

  • The system cannot represent how you route, cost or schedule work.
  • The edition you run is losing support or cannot be updated.
  • Every report is rebuilt in a spreadsheet because the data model fights you.
  • The cost of the workarounds is larger than a migration, measured on real jobs.

Whatever you run, for example JobBOSS², E2, ProShop, Epicor or Global Shop Solutions, we check the installed edition, what is licensed but unused and what its supported connectors allow before suggesting either path. We do not resell or rank ERP packages; product names are things to inspect, not partner or access claims.

SCHEDULING WITHOUT A FULL ERP

How can a small shop schedule jobs without a full ERP?

Start with one shared, current list of released jobs: each job's operations in order, the machine or cell for each, the promised date and who updates its status. For many small shops, a well-kept spreadsheet or the scheduling module they already own covers the normal case. The usual failure is that status lives on paper travelers, and nobody updates the list when a job slips.

Settle these before choosing a tool

  • The routing for each part: which operations, in what order, on which machine.
  • Who updates status, and when: end of each operation, end of shift or at shipping.
  • How a rush job, a scrapped part or a machine that is down reorders the list.
  • Who tells the customer about a slipped date, and from which record.

When the list is no longer enough

  • Add a small status step on the floor, such as a tablet or a scan at each operation, that writes back to your system of record.
  • Avoid a second schedule beside the ERP that drifts out of date.
  • Evaluate a dedicated scheduling package when many machines share constraints and the list can no longer be kept current by hand.

See the job-status handoff

FICTIONAL DEMONSTRATION

Walk a fictional request for quote through review.

The fictional RFQ lab shows a sample request checked, an exception raised, a draft quote prepared with sample arithmetic and the next handoff previewed. Every company and number in it is invented; it is not a client result, a production integration or a promise of shop capacity.

Open the fictional RFQ lab

THE BUSINESS SYSTEMS REVIEW

Bring one recent RFQ.
Leave with a next check.

In a complimentary 30-minute review, we trace one request from the inbox to the job and name where it was re-typed, chased or unclear. The answer may be a setting, a process change, a supported connection, a bounded build or no project.

Book a free 30-minute reviewBook a review

Likely outputs

  • A short map of the request-to-job path with owners and exceptions.
  • The existing feature or connector to try first, if one fits.
  • If a build is justified, its scope, acceptance cases and manual fallback.

No quote, order or customer record is created by this page.

QUESTIONS

Answers before you book.

How do job shops cut quoting time without a new ERP?

Start with the quote-to-job seam you already have. Many job-shop systems and quoting tools can turn an approved quote into a job; the time usually goes to reading requests, chasing missing details and typing numbers again. Fix intake and the handoff first, keep your system as the record, and measure one real quote before and after. See configure, connect or build

Can AI quote our parts?

Not on its own. AI can read an incoming request, pull out part number, revision, material and quantity, and flag what is missing. Pricing, tolerances, routing and the decision to quote stay with your estimator. A fixed rule or your quoting software is better wherever the calculation is already known. What AI can and cannot read on a drawing

We use a job-shop ERP and a separate quoting tool. Can they be connected?

Possibly. Some vendors publish connectors between quoting and job-shop systems; your edition, plan, configuration and permissions decide what is actually available. We check the supported path first and only build what that path leaves open. Product names are things to inspect, not partner or access claims.

What about drawings with controlled data?

If a workflow touches controlled defense data (for example CUI or ITAR material), we cannot take it on today. We will say so in the first conversation and stop, rather than move those files through a new tool.

What should a machine shop bring to a review?

One recent request for quote traced from the inbox to the job: who read it, where it was typed, what was missing and how long it took. A description is enough; leave out real drawings and customer files.

LET’S LOOK AT THE REAL WORK

What is your team
working around?

Bring the messy process, something new you want built, or the question of where AI fits. We will work through whether there is a sensible way to improve it.

Book a free 30-minute reviewBook a review

Free, 30 minutes, no commitment.
Start with the problem, not the technology.